PROSPECTIVE BIDDERS:

Please note that accessing the documents from this webpage does not add you to our plan holders list.

You must be added to the plan holders list to receive meeting minutes and addenda prior to submitting a bid.
To be added to the plan holders list, please follow the instructions in the Notice to Bidders document.


 

Water Quality Initiative Projects


Ag Drainage Well Closure-Wetland

None at this time.

 

Urban Conservation Projects

Request for Urban Conservation Pre-Applications

Pre-Applications are Due: NO LATER THAN 4:30 PM, FRIDAY, NOVEMBER 17, 2023

 

Nutrient Reduction Strategy Targeted Watershed Implementation

Nutrient Reduction Strategy Demonstration Projects

Proposals are Due: NO LATER THAN 4:30 PM, FRIDAY, MAY 24, 2024

 

Nutrient Reduction Strategy Planning and Development Projects

None at this time.

 


Division Engineering Prequalification

The Division contracts several types of professional engineering consulting, land surveying, and design services, and maintains a list of prequalified firms or individuals interested in performing such services. Prequalification is not an award and does not create an obligation on behalf of the Division. Prequalified firms and individuals will receive a Request for Proposal (RFP) whenever the Division requires the type(s) of services for which they are prequalified. Service types included for prequalification at this time are:

  • Abandoned Coal Mine Land Reclamation engineering and design services for both traditional and natural landform designs;
  • Engineering design and land surveying services for nutrient reduction infrastructure practice types including:
    - Wetlands (traditional breakpoint, flood plain, oxbow, tile zone, and pumped);
    - Edge-of-field practices (saturated buffers, woodchip bioreactors, drainage water management); and
    - Grade stabilization structures
  • Engineering design review services for urban conservation practices; and
  • Update and review of the Iowa Stormwater Management Manual chapters

If you are interested in submitting a Statement of Qualifications (SOQ) for any of the above service types, please submit a Letter of Interest (LOI) to Tracy Bruun at tracy.bruun@iowaagriculture.gov. Letters of interest must include the firm or individual’s office location, contact information, and which types of services they are interested in submitting qualifications for. If you have previously requested an SOQ review and were not considered qualified, your LOI must also include the date of previous SOQ submission(s) and a list of changes that address the previously unmet requirement(s). Upon receipt of an LOI, interested firms and individuals will be sent the full SOQ requirements and instructions.

Invitation to Quality ITQ-24-01

Letter of Interest due August 2 by 5:00 PM
Statement of Qualifications Due August 30 by 5:00 PM
Note: Requirements for Wetlands, Edge-of-Field and Grade Stabilization Structures have been updated. 

  1. ITQ Notification Letter

EOF Batch and Build Projects


None at this time.


Nutrient Reduction Wetland Projects


Bid 24-04 Nutrient Reduction Wetland Bre911312B

Pre-Bid Meeting July 15, 2024 - see Notice to Bidders for information (General Requirements)
Bids DUE: 3:00 PM August 1, 2024
Bid opening 3:10 PM August 1, 2024

  1. Notice to Bidders
  2. General Requirement
  3. Final Specs
  4. Final Plans
  5. Submittals
  6. Appendix I - Construction Admin Forms
  7. Appendix II - H&H Stormwater Report
  8. Pre-Bid Minutes, Questions, Addenda
  9. Plan Holders List

Bid 24-05 Nutrient Reduction Wetland Gru881728C

Pre-Bid Meeting July 15, 2024 - see Notice to Bidders for information (General Requirements)
Bids DUE: 3:00 PM August 1, 2024
Bid opening 3:20 PM August 1, 2024

  1. Notice to Bidders
  2. General Requirements
  3. Construction_Specifications
  4. Design Plan
  5. Submittals
  6. Appendix_I_- Construction Admin Forms
  7. Pre-Bid Minutes, Questions, Addenda
  8. Plan Holders List
     

Abandoned Mine Land Projects


Pella North and South AML Reclamation Project, Bid IA-292 and IA-293

  1. Pella General Requirements
  2. Pella Construction & Supplemental Specs
  3. Pella Plan Sheets 1 to 16
  4. Pella Plan Sheets 17 to 43
  5. Davis-Bacon Wage Determination 
  6. Submittal Documents

Kuiper AML Reclamation Project, Bid IA-024

  1. General Requirements
  2. Construction and Supplement Specifications
  3. Plan Sheets 1 to 7
  4. Plan Sheets 8 to 20
  5. Davis-Bacon Wage Determination
  6. Submittal Documents

Bos AML Reclamation Project, Bid IA-172

  1. General Requirements
  2. Construction Specifications and Supplement Construction Specifications
  3. Plan Sheets 1 to 19
  4. Appendix
  5. Davis-Bacon Wage Determination
  6. Submittal Documents